Entries in wind power (141)

5/29/11 Oh, THAT'S what a wind lease 'gag-order' looks like AND Component failure timeline and other delights: From the wind industry's point of view: pesky O&M costs biting into profits

WHAT'S BLACK AND WHITE AND YOU CAN'T TALK ABOUT IT FOR THE REST OF YOUR LIFE?

Sorry. I signed a wind lease. I can't discuss it.

NOTE FROM THE BPWI RESEARCH NERD: Better Plan has been collecting copies of wind leases for the last few years and has yet to find one that didn't contain a confidentiality agreement ---also known as a 'gag order'

Landowners who share wind leases are taking a clear risk, but more are coming forward anyway. One farmer who shared his contract said, "I don't care anymore. I just don't want this to happen to anyone else."

The section below is copied from a wind lease contract that came our way. The landowner who signed it agreed to allow noise, vibration, shadow flicker and any other disruption the turbines might cause to take place on his property. If he has problems with these things he can't talk about it because the gag order requires that he:

Not to talk about the contents of lease to anyone. 

Not to talk about the construction or operation of the turbines.

Not not speak to reporters or anyone in the media or issue statements or press releases unless the wind company gives the landowner their written permission.

The landowner also had to agree that the gag order would still apply long after the turbines are gone. This line says it all: "This section shall survive the termination of expiration of this lease"  It means this gag order is forever.

The landowner can talk to his lawyer or accountant and certain others about the contract but only after they agree to a gag order too. 

 STRAIGHT FROM THE CONTRACT:

Confidentiality

(Landowner) shall maintain in strictest confidence, for the sole benefit of (wind developer) all information pertaining to the terms and conditions of this lease, including, without limitation, the construction and power production of the wind farm.

Without first obtaining written permission from the (wind developer), (the landowner) shall not issue any statements or press releases or respond to any inquires from news media regarding such matters.

(Landowner) shall maintain the strictest confidence, for the sole benefit of the (wind developer) all information pertaining to the terms and conditions of this lease, including, without limitation, the financial terms hereof.

This section shall survive the termination of expiration of this lease.

Nothing in this section shall prohibit sharing or disclosing information with any party's (lawyer) accountants or current or prospective investors, purchases, lenders or as required by law, provided that the party sharing or disclosing such information requires the recipient to maintain the confidentiality of such disclosed information

FROM THE DEVELOPERS POINT OF VIEW

Wind Energy Update: Wind Farm O&M - Best Practice On Cost Containment Elusive

The constantly evolving wind turbine market means that new components must continually be demonstrated, with little assurance of their availability five years down the track in the event of component failure.

Posted on: Monday, 23 May 2011

SOURCE: "Wind Energy Update" VIA PR WEB

When it comes to turning a profit throughout the lifecycle of a wind farm, just a one percent improvement in operations and maintenance can make a huge difference to the bottom line, according to the latest Wind Energy Update Operations & Maintenance Report 2011.

(PRWEB) May 23, 2011

When it comes to turning a profit throughout the lifecycle of a wind farm, just a one percent improvement in operations and maintenance can make a huge difference to the bottom line, according to the latest Wind Energy Update Operations & Maintenance Report 2011. [Click here to download report]

The challenge, however, is how to achieve that one percent improvement in the face of operations and maintenance (O&M) costs that are double or even triple initial projections.

O&M costs under-estimated

On the basis of an exhaustive industry survey, the latest report finds that wind farm return on investment is around -21 percent. This underperformance is attributable to over-estimation of power production and underestimation of O&M costs say the report’s authors.

In the early days, the industry had costed out O&M at roughly 0.5c/kw over a turbine’s 20-year life. But as newer models and their respective components continued to flood the market, this has turned out to be far from the reality.

The report highlights that wind O&M costs can now be expected to increase on average 253 percent over the 20-year life of the various wind machines.

“Given that every wind turbine comprises an average of 8000 components, it is not surprising that higher-than-expected rates of component failure continue to plague the industry,” say the report's authors.

Understanding the root cause

The constantly evolving wind turbine market means that new components must continually be demonstrated, with little assurance of their availability five years down the track in the event of component failure.

Of even greater concern is that, if not properly addressed early on, component failures can persist through new product generations. It is therefore vital, despite pressure from competitors to continuously push the boundaries on nameplate capacities, that both the onshore and offshore industries adopt a backwards compatibility approach when evolving each model.

A thorough understanding of failure trends can also provide a basis for the best O&M practices for a given system, say the reports authors.

Sketching a component failure timeline, the authors characterise earliest wind turbine designs (1987-91) by their gearbox failures, while wind turbines built between 1994-99 are characterized by electronic power failures.

Turbines manufactured between 2000-2004, again exhibit problems with generators and gearboxes. More recent models are plagued with issues linked to retrofits.

Aftermarket potential

But there is a silver lining. Some component suppliers to the OEM wind turbine market view the aftermarket as a new, long-term opportunity.

“Advances in turbine design may make certain parts obsolete, but with a typical projected turbine life of 20 years or more, the aftermarket will provide ongoing spares demand for these suppliers for some time to come”, says the report.

The report also notes that in the long-run, as the wind industry matures and begins to validate the success of condition and performance monitoring systems, as direct drive turbines replace gear-box driven turbines, and as the industry begins to collaborate on O&M, reductions in long-term O&M costs are the most likely scenario.

DOWNLOAD Wind Energy Update Operations & Maintenance Report 2011.

5/27/11 The making of the BBC's Windfarm Wars AND Miserable because of turbine noise? Tough luck, whiner. Live with it.

FROM THE U.K.

WINDFARM WARS: FILMING THE RENEWABLE ENERGY DEBATE IN DEVON

READ THE ENTIRE STORY AT THE SOURCE: BBC TV

May 24, 2011

Jeremy Gibson

When I convinced the BBC to commission Windfarm Wars, call me naive, but I had no idea it would take seven years of my life to deliver. And doubtless most of the people we've followed with the camera over all those years didn't figure their lives would evolve this way either.

And, over that time, the whole question of how the country best provides for its burgeoning energy needs in a sustainable way has, quite simply, become more and more tortuous. Toxic even.

Windfarms divide opinion like few other topics. They are beautiful to some, eyesores to others.

Rachel Ruffle from Renewable Energy Systems, standing by a wind turbine.

 

They are free sustainable energy or expensively inefficient. They desecrate the landscape, or they protect its future existence.

For a filmmaker treading into this minefield, the antagonism between incoming developers and the local residents they seek to convince can be most difficult to negotiate.

Renewable Energy Systems, or RES, first put forward their plans for a windfarm in Devon in 2004.

It would be sited four-and-a-half miles from the northern edge of Dartmoor National Park, in the shallow valley of Den Brook.

I started as the film's executive producer, largely office-based, but with a director and small team on location.

But, seven years later, I had become the sole production member the budget could still afford to have on location, shooting on my own to see the story through - and the windfarm had still not been built

Early on, we were lucky enough to gain access to all sides of the Den Brook dispute, from developers RES, to landowners and protestors alike, and to the council and council planning committee.

As the story went on, and on, over the years, this access widened to include lawyers and barristers, expert witnesses, and the planning inspectors involved in public inquiries.

Maintaining everyone's commitment and involvement over the long years of the process demanded confidentiality and tact.

Each side had to trust that we would not tell the other things that only we knew.

Windfarm Wars was originally commissioned as a single film - an observational documentary. We would follow whatever happened, wherever developments took us.

By the time the commission fell into place and the director of the first film, Olly Lambert, arrived in Devon, RES had already held their introductory exhibitions, where they showed the residents of the nearby villages what the windfarm might look like and where it would be situated, and answered their interests and concerns.

Feelings for and against the windfarm were already running high.

It's difficult to gauge the true feelings of a whole community. One of the ways is to go by those who have bothered to write letters to the council.

When the closing date came, the council had 402 letters and 3,000 questionnaires in objection and 31 letters in support.

We roughly assembled the material as we went along but each time a viewing with the BBC had come due, it was apparent that a chapter may have finished - but the big story was still unresolved.

Luckily they had the vision to keep running with it. Eventually it became a four-part series. BBC channel controllers have come and gone while waiting for it to materialise.

At times, as long waits for the next part of the planning or legal process had to be endured, it was tempting to wrap up the project, but I wanted everyone involved in the whole process to know it was being documented very publicly, and that it would be seen through to the end.

Bash and Mike Hulme, who were campaigning against the wind farm, outside their cottage in Devon.

 

And, as concerns about global warming, reduction of carbon dioxide emissions and the security of energy supplies became more and more acute over the years, the project gained in significance, and just had to be seen through.

What emerged is what I hope some people will see as a unique social record of how one of the nation's key dilemmas has unfolded in the early 21st century.

The four films unravel as a narrative story, and while viewers think they may know where they stand initially, a fair few may well change along the way.

Windfarm Wars will no doubt raise tempers, and for some of the many people who've taken part it will be difficult viewing - not least to see how we've all aged through the process.

Perhaps it will be difficult too, because all sides may need to confront and acknowledge mistakes, to review how they could have done things better.

For many, it's clearly been a journey that's taken courage, commitment and faith in the search for what each perceive to be the truth - the best way forward for the good of all. There may be regrets.

I hope, though, that the end product of the process of documentation has been usefully revealing and thought provoking, and that it will, in time, repay the commitment that many gave to the project. We'll see - soon enough.

Jeremy Gibson started as executive producer and also worked as series producer of Windfarm Wars.

From Ontario

WIND TURBINE NOISE ANNOYING 'FACT OF LIFE' PROVINCIAL LAWYER SAYS

READ ENTIRE STORY AT THE SOURCE: Postmedia News, www.ottawacitizen.com

May 27, 2011

By Lee Greenberg

A government lawyer fighting off a major challenge to wind energy in Ontario says the foremost health impact complained about by detractors is not a medical condition at all, but a “fact of life.”

Frederika Rotter cast aspersions on the term “annoyance,” which opponents describe as a critical health condition caused by giant wind turbines, which emit noise that, they say, causes a number of other physiological effects, including sleep disturbance, headache, irritability, problems with concentration and depression.

“Annoyance doesn’t equal ‘serious harm to human health,’ ” Rotter told an Environmental Review Tribunal panel Thursday. “You could be annoyed by your neighbour’s screaming. Everyone suffers from annoyance.”

Eric Gillespie, a lawyer for an antiwind group hoping to keep industrial wind farms out of the province, argued Thursday that the government didn’t adequately consider the adverse effects of wind turbines on human health.

The hearing is an attempt by Gillespie and the grassroots anti-wind organization he represents to appeal an eight-turbine wind farm run by Suncor Energy Services Inc. in southwestern Ontario known as Kent Breeze. The project in Chatham-Kent is to be the first under Ontario’s Green Energy Act, the 2009 legislation designed to encourage wind, solar and other renewable energy projects in the province.

The legislation is lauded by environmentalists but has stirred controversy in rural communities, which, under the new law, have lost the power to determine where the massive turbines will be placed.

While wind energy is generally supported from afar, it generates substantial opposition in host communities. The Green Energy Act was designed to combat that NIMBYism by centralizing the decision-making process.

A large group of angry rural residents joined together in response and funded the current case against Kent Breeze.

While Gillespie, the group’s lawyer, couldn’t pinpoint the cause of the health effects of turbines -saying it could be low-frequency noise, infrasound (not audible to humans) or even visual appearance -he compared the situation to a restaurant serving contaminated food.

The restaurant would be closed, he said, before health authorities determined whether it was “the tomatoes or the fish” that caused the food poisoning.

“We don’t wait,” he said. “We act.” Rotter accused Gillespie of building a spurious, scattergun case against turbines. “The bulk of his evidence is speculation and fearmongering,” she said.

The government lawyer said many of the anti-wind group’s “experts” were in fact advocates.

They include Dr. Robert Mc-Murtry, a notable orthopedic surgeon and former dean of medicine at the University of Western Ontario who became interested in turbines when an installation was proposed near his residence in Prince Edward County.

Rotter said McMurtry and two other physicians relied upon by Gillespie were members of local wind opposition groups as well as an international group that opposes wind turbines.

The research the doctors conducted was not in their field of expertise and was based on “biased and selective evidence,” she said.

“It was done to prove a thesis they already had in pursuit of making their case.”

Gillespie concluded his submissions by stating the Chatham-Kent wind farm, if allowed to go ahead, “will cause serious harm to human health.”

Rotter disagreed, playing down the impact the turbines will have on its neighbours.

“Noise is noise,” she said. “We all live with it. It’s not harmful at the volumes that will be generated at Kent Breeze. Whether you’re annoyed by it is another story.”

The panel will decide on the case by July 18.

5/26/11 Shirley Runs off with Duke: Flipping a Wisconsin wind farm for fun and profit-- well, not for residents, but for the developer AND The wind industry calls them 'whiners', the rest of us call them people: A pharmacist visits a wind project to see what all the fuss is about

Wisconsin Wind Farm Sold to Duke Energy

Company Will Surpass 1,000 Megawatts of Wind Power

 

 

PRESS RELEASE: CHARLOTTE, N.C., May 26, 2011 /PRNewswire/ -- Duke Energy (NYSE: DUK) will acquire a 20-megawatt wind farm in operation in Wisconsin.

Duke Energy Renewables, a commercial business unit of Duke Energy, agreed to purchase the Shirley Windpower Project from a subsidiary of Central Hudson Enterprises Corporation on May 24. The wind farm is located on approximately 500 acres of leased land in Glenmore, roughly 30 miles southeast of Green Bay.

The Shirley Windpower Project, which began commercial operation in December 2010, sells all of its output and associated renewable energy credits to Wisconsin Public Service Corporation under the terms of a 20-year power purchase agreement. The eight Nordex 2.5-megawatt (MW) wind turbines that comprise the Shirley Windpower Project are capable of generating enough electricity to power approximately 6,000 homes.

"Our strategic acquisition of the Shirley Windpower Project not only helps us reach the 1,000-megawatt milestone, it serves as a springboard for growth in a new region of the United States," said Greg Wolf, president of Duke Energy Renewables.

The deal is expected to close this summer. The purchase price was not disclosed.

With the addition of the Shirley project, Duke Energy Renewables will own 1,006 MW of generating capacity at 10 U.S. wind farms – four in Wyoming, three in Texas, one in Colorado, one in Pennsylvania, and one in Wisconsin.

On May 24, Duke Energy Renewables announced plans to start construction of a 168-MW wind power project in Kansas in the fall of 2011.

Since 2007, Duke Energy has invested more than $1.5 billion to grow its commercial wind and solar power businesses.

About Duke Energy Renewables

Duke Energy Renewables, part of Duke Energy's Commercial Businesses, is a leader in developing innovative wind and solar energy solutions for customers throughout the United States. The company's growing portfolio of commercial renewable assets includes nine wind farms and four solar farms in operation in five states, totaling approximately 1,000 megawatts in electric-generating capacity.

Headquartered in Charlotte, N.C., Duke Energy is a Fortune 500 company traded on the New York Stock Exchange under the symbol DUK. More information about the company is available on the Internet at: www.duke-energy.com.

MEDIA CONTACTS

Duke Energy


Greg Efthimiou


704-382-1925



24-Hour

800-559-3853

 

NOTE FROM THE BPWI RESEARCH NERD: The Enz family abandoned their home in this wind project because of turbine related problems. The project, which has been on line for less than a year, has already been sold twice. Read about the Enz family and why they left their home by clicking here.

·FROM AUSTRALIA

From:  George Papadopoulos, Pharmacist
To:  Jillian Skinner MP, NSW Minister for Health; Brad Hazzard MP, NSW Planning Minister
Regarding:  Wind Turbine Syndrome victims of the “Crookwell 1 Trial Wind Turbine” site, New South Wales (Australia)
Date:  May 24, 2011

 

Dear Ministers,

I am a trained and registered, practising health professional (pharmacist).

Yesterday, I met two elderly ladies from the Crookwell region who have been for years quietly suffering the effects of what has been described as Wind Turbine Syndrome.

These ladies have been quietly suffering for years. Their local medical practitioners are unable to do much beyond prescribe antidepressants, sleeping tablets and other medication, or recommend that they move.

There is a lack of “published peer reviewed evidence” that these health problems exist, as the Australian National Health and Medical Research Council’s (NH&MRC) “Rapid Review” report pointed out.  But that does NOT mean there is no health problem, which is what the wind developers and many individuals in government have been wrongly inferring or assuming from the NH&MRC’s report. They have ignored the NH&MRC’s advice to “adopt a precautionary approach.”

I asked one of these ladies why she hasn’t taken the matter further—why she isn’t discussing the matter with the locals. Well, surprisingly, the locals have ostracised her for making comments that might affect the tourist business in Crookwell. So she decided to shut up and suffer, or otherwise become a social outcast.

So who is listening to these quiet victims of this “innovative,” original New South Wales (NSW) wind turbine trial? Why is it that the suffering of these quiet victims has not affected the planning process of newer wind turbine developments?

Strange isn’t it? What was the point of this trial site?

I then decided with two companions to pay my own visit to the local trial industrial wind turbine site—situated amongst rural blocks. I have never been so close to a wind turbine site before. In fact, so close (within 250 metres) thanks to a third victim of this development, who allowed us to access their property. This third victim also needs sleeping pills to sleep and is unduly chronically ill due to Wind Turbine Syndrome.

Well, our experience was absolutely stunning! Almost immediately, pressure sensations in the head abruptly started—plus blocked ears that could not be relieved by swallowing or yawning. We couldn’t hear any loud deafening noises, but the constant whooshing noise was phenomenal—enough to drive you mad.

We were ultimately compelled to leave the site due to severe nausea in all three of us. Perhaps it wasn’t a good idea to get so close to the turbines. Eventually it was only at 5km away that we finally felt totally relieved and normal—we had finally escaped this whirlpool of disaster.

My dear politician, I am not having a joke. This is no good story. It is a very sad reality of what is happening here in Australia, in our meant-to-be progressive, clean democracy where the rights of the individual should be upheld against the little, if any, good that can be found in these developments.

Why are our planning departments ineffective in drafting policies to protect public health? Why aren’t our health departments effective in monitoring the health of individuals surrounding these industrial power sites? Why are the local medical practitioners and other local health professionals so slow in protecting these most sweet, kind-hearted elderly souls?

The reason is, despite these problems being reported globally, no government has listened to its citizens and ensured that appropriate independent acoustic and medical research is commissioned and funded, to help find out why these problems are occurring and how to prevent them. Or, in plain terms, research which will determine the safe distance between turbines and homes and workplaces.

If this were a drug, these experiences would be reported as “Adverse Events” and the drug would be withdrawn, pending further investigation until its safety from unanticipated side effects could be guaranteed. The equivalent in this situation is to immediately instigate a moratorium where turbines are close to homes, and fully investigate these occurrences.

It’s time to do something about it. The recent Federal Senate Inquiry has heard many stories such as the one above, in both written and oral testimony. I hope you feel compelled as a publicly elected official in a democratic country to do something about this great injustice—and stop it from happening again and again in different sites around NSW and the rest of Australia.

5/25/11 Reading between the (power) lines: They bought it but lost the receipt and can't return it: How Alliant blew $5 Million bucks on purchase of NextEra wind project then cancelled it-Wisconsin politics gets the blame AND Moratorium on all wind development passes Connecticut's House of Representatives by a landslide 

READING BETWEEN THE (POWER) LINES

Note from the BPWI Research Nerd: Lobbyists and wind developers tell the media that wind projects are being cancelled in our state because of the 'uncertain' regulatory environment, resulting in headlines in the press and on the web like this:

"TURBINE SETBACK RULE SOUNDS DEATH KNELL ON WISCONSIN'S WIND INDUSTRY"

DEVELOPER PULLS PLUG ON WISCONSIN WIND FARM OVER POLICY UNCERTAINTY

LARGE WISCONSIN WIND FARM KILLED BY POLITICS

Similar headlines came when Wisconsin utility, Alliant, recently announced it was cancelling its plans for a wind project in Green Lake County.

WALKER'S WAR ON WIND ENERGY CLAIMS ANOTHER VICTIM

THIRD LARGE WISCONSIN WIND PROJECT CANCELLED DUE TO LEGISLATIVE ACTION

WISCONSIN  WIND RESTRICTIONS COST UTILITY $5 MILLION

The story in the Milwaukee Journal Sentinel began like this:

"Moves to restrict wind farm development in Wisconsin led a Madison utility to take a $5 million charge, citing the difficulty of being able to build the project in Green Lake and Fond du Lac counties."

The '$5 Million dollar charge' appears to be the price paid for the project by Alliant to Florida Power and Light (now known as NextEra) a company with a history of coming into our state to sign up landowners to host wind projects and then selling the leases to utilities. (Apparently undeterred by Wisconsin's 'uncertain regulatory climate' a developer for NextEra is currently prospecting for wind rights in Rock County's Spring Valley Township.)

The purchase of the FPL/NextEra project was reported in March 2009 by Journal Sentinel this way:

"The Madison utility holding company has reached an agreement with NextEra Energy Resources, a unit of FPL Group Inc., to buy wind power from NextEra under a 25-year contract. Under the deal, Alliant also would buy development rights to a future wind farm in the Green Lake area, utility spokesman Rob Crain said....Though specific details about the pricing terms to buy wind power from NextEra are confidential, Crain said, "These are reasonable and cost-competitive projects."

Although the cancellation of the Alliant/NextEra project has been portrayed in the media as another example of Wisconsin politics driving out wind development, the following article sheds light on the real reason Alliant decided to take the $5 million dollar hit and pull out of the project.

Alliant spokesman, Steve Shultz seemed to contradict himself when asked about the reason behind the cancellation of the project.

To Milwaukee Journal Sentinel he said:

"The $5 million charge is in recognition of the fact that it will be much more difficult to build the wind farm given uncertainty in the state’s wind siting requirements, said utility spokesman Steve Schultz."

To The Ripon Press he said:

Schultz emphasized the Green Lake-area wind farm was never a concrete plan or proposal, but rather a possibility.

“At no point have we had any timeline or any specific plan as to say, ‘We’re going to build a wind farm here at such-and-such a date,’” he said.

The article below tells us even more--

ALLIANT PASSES ON LOCAL WIND FARM

READ THE ENTIRE STORY AT THE SOURCE: RIPON PRESS

May 18, 2011

By Aaron Becker

Explaining why Alliant has abandoned the area development rights, Schultz said the Madison-based utility has reached its “renewable portfolio standard” for the state.

“We’re exceeding that, actually,” he said. “And at this point in time, we don’t see that that requirement is going to increase in the near future.”

Alliant Energy has decided not to pursue a significant wind-turbine farm near Green Lake.

In 2009, the utility company bought development rights from NextEra Energy Resources for a region around the Green Lake-Fond du Lac county line, with the idea of a possible wind farm in the future.

If developed, it may have accommodated about 60 turbines. But this month, the company announced it nixed that idea.

“We’re essentially discontinuing those development rights,” Alliant Energy spokesman Steve Schultz said.

This means Alliant has taken a $5 million loss — the cost to purchase the rights.

This cannot be recouped via utility charges. It just goes down as a loss, he explained.

The decision also means the wind energy rights to that area now are fair game for any other company, Schultz said.

It’s not out of the question that another company may be or become interested, as Alliant previously had noted the Green Lake area as having a “strong wind regime,” thanks in part to Big Green.

Explaining why Alliant has abandoned the area development rights, Schultz said the Madison-based utility has reached its “renewable portfolio standard” for the state.

“We’re exceeding that, actually,” he said. “And at this point in time, we don’t see that that requirement is going to increase in the near future.”

Schultz emphasized the Green Lake-area wind farm was never a concrete plan or proposal, but rather a possibility.

“At no point have we had any timeline or any specific plan as to say, ‘We’re going to build a wind farm here at such-and-such a date,’” he said.

Rather, it was a “potential future development,” he said.

Still, it probably would have been a large wind farm, had it come to pass.

“What we had determined was that the site would accommodate about 100 megawatts ... Probably in the range of 60 turbines,” Schultz said.

As of 2010, Wisconsin was home to nine commercial wind farms, with more than 400 megawatts of wind power capacity, according to the Alliant Energy website.

In this region, Fond du Lac County and northeastern Dodge County are home to five of those nine sites. Turbines can be seen from Highway 41.

“Wind power is the fastest-growing energy source in the world,” the website reads.

Wisconsin Power & Light — a subsidiary of Alliant — operates the Cedar Ridge Wind Farm in Fond du Lac County.

The 68-megawatt wind farm began producing emissions-free energy in 2008. The company’s second wind farm, the Bent Tree Wind Farm in Freeborn County, Minn., began commercial operation in February.

“Just because we’re not going to continue the development rights in Green Lake doesn’t mean we’re not committed to renewable energy,” Schultz said.

 

5/21/11 Did the farmer at least get a kiss before he signed that wind lease? AND O, Canada, the turbines there are as bad as the turbines here

THIS FROM MICHIGAN:

WIND DEVELOPERS BEHAVING BADLY, CHAPTER 723: How to buy a 76 year land lease from a 73 year old man for just $150.00

"Some of the lease agreements Balance 4 Earth has signed with residents allow the company to operate for up to 70 years on a property, with an initial six year period to be followed by a 30 year period and two 20-year extensions, at the company’s discretion[...]

Bernard Keiser, 73, of Bliss Township, said he signed the lease agreement with Balance 4 Earth to help join his 15 acre lot with a 79-acre lot owned by his brother, who is in a nursing home. Bernard signed the lease agreement for $150."

READ THE ENTIRE STORY HERE: WIND ENERGY: STILL STORMY DEBATE IN EMMET COUNTY

FROM ONTARIO:

THE GREAT DIVIDE OVER WIND POWER; WHERE WINDS BLOW, STORMS FOLLOW

READ THE ENTIRE STORY AT THE SOURCE: The Ottawa Citizen, www.ottawacitizen.com

May 21, 2011

By Don Butler

“The noise is, at times, huge.” Sometimes it sounds like a pulsing jet engine. At other times, it’s a constant rumble, like an endless freight train passing. Neighbours tell her it’s like living near an airport.

“The range of noise is unbelievable, and it’s all so completely different from what you’re used to that you just stop whatever you’re doing,” Elmes says. “I used to love my neighbourhood. I don’t anymore.”

When Monica Elmes and her husband Neil bought their 35-hectare farm near Ridgetown in southwestern Ontario 15 years ago, the rural peace and serenity was the main attraction. “It was like heaven,” she says.

They put their hearts and souls into renovating the old farmhouse. “We did that thinking we’d never have to consider leaving.”

But that was before a 100-megawatt wind farm began operating next door in December. Forty-four turbines, each more than 400 feet tall, now surround her paradisical farm on three sides. The nearest is about 1.5 kilometres from her house.

“It sucks,” says Elmes. “The noise is, at times, huge.” Sometimes it sounds like a pulsing jet engine. At other times, it’s a constant rumble, like an endless freight train passing. Neighbours tell her it’s like living near an airport.

“The range of noise is unbelievable, and it’s all so completely different from what you’re used to that you just stop whatever you’re doing,” Elmes says. “I used to love my neighbourhood. I don’t anymore.”

Elmes is not alone. Fertilized by generous subsidies in the Ontario government’s Green Energy Act, industrial wind turbines are sprouting like dandelions across the province’s rural landscape, finding willing hosts in farmers and other property owners eager to earn some money by leasing their land.

There are 914 turbines provincewide, theoretically capable of generating up to 1,636 megawatts of electricity.

The province already has signed contracts with wind companies that will roughly double that number. And it has received applications for a further 3,000 or so turbines, with an installed capacity of 6,672 megawatts, according to the Canadian Wind Energy Association.

Within the foreseeable future, in short, close to 5,000 wind turbines could blanket rural Ontario.

Urban residents, who largely regard wind power as an unbridled virtue, might cheer that news. But in rural areas, the turbine invasion has generated anger, alarm and corrosive social division, pitting those who welcome wind power as an economic boon against those horrified by what they view as a threat to their health, wealth and enjoyment of life.

“There are families in Ontario who no longer speak to each other because of this issue,” says John Laforet, head of Wind Concerns Ontario, a coalition of 57 mostly rural anti-wind groups whose website has attracted nearly 1.5 million views. “It’s perceived that some are prepared to destroy the community in exchange for a few thousand dollars.”

“It’s terrible,” moans Wayne Fitzgerald, mayor of the rural municipality of Grey Highlands, where a wind developer is poised to start construction on an 11-turbine project. “We’re torn on council, we’re torn in the community. The people who are opposed to it are very, very vocal. They feel quite strongly.”

The issue will have a “profound impact” on the outcome of this October’s provincial election, predicts Laforet, whose group is actively preparing to organize against the governing Liberals.

“It’s going to be a real problem for the Liberals because we can mobilize in somewhere between 24 and 26 Liberal ridings in rural areas,” he says. “I’m quite confident that wind-concerns groups can move the bar enough in enough ridings to defeat the government.”

Wind turbines were a lively issue in last fall’s municipal election in pastoral Prince Edward County near Belleville, where a nine-turbine project along a major path for migratory birds is close to proceeding and numerous others are in various stages of development.

Voters responded by electing Peter Mertens, who campaigned against wind development, as mayor. They also transformed what had been a pro-wind council into one that passed a motion in January calling for a moratorium on wind development. About 80 municipalities have passed similar resolutions.

“It became an extremely divisive issue, and it has probably gotten worse, if anything,” Mertens says. Urbanites who fled to the county to enjoy its scenic beauty have found themselves at odds with longtime farm residents who see the turbines as a way to generate needed cash.

Most wind farms are in central or southwestern Ontario. There are 162 turbines in Bruce County alone, with nearly 480 more proposed. Chatham-Kent has 203 turbines, with about 430 more in the works.

Wolfe Island, across the harbour from Kingston, is home to the only wind project in Eastern Ontario. Operating for two years with 86 turbines, it’s the second-largest in Canada. But Kemptville-based Prowind Canada has proposed smaller projects near North Gower, Spencerville, Carleton Place and Winchester.

Opponents have mobilized. The North Gower Wind Action group, formed to fight a proposed eight-to-10-turbine project near the village, has about 300 supporters. “These are industrial structures,” says Jane Wilson, the group’s chair. “They’re not little windmills. These ones are about 190 metres tall. That’s twice the height of the Peace Tower.”

For opponents, the sheer scale of the turbines is only part of it. There are also concerns about their impact on health and property values.

Opponents say studies have found that those living adjacent to turbines have lost between 20 and 40 per cent of their property value. In some cases, properties have become virtually unsellable.

When prospective buyers come to Prince Edward County — a mecca for former urbanites seeking a bucolic alternative —the first thing they ask real-estate agents is whether a property is near an area that may get turbines, says Mertens. If so, they aren’t interested.

Mertens had an e-mail recently from a property owner who’s been trying to sell a lot near one of the proposed projects for two years, without success. “He told me he’s walking away from the lot now. He no longer wants to pay taxes on it.”

Energy consultant Tom Adams, a critic of the Green Energy Act, spoke at a conference last month organized by an anti-wind group in Meaford, near Georgian Bay. Astonishingly, more than 250 people showed up on a sunny spring Saturday to hear Adams and other speakers.

“It was a huge eye-opener for me,” Adams says. “They are so pissed off about this. We’re talking about something really deep here — the protection of people’s land value. People get emotional about that subject.”

A tax assessment hearing now under way could help provide some clarity on the issue. Gail and Edward Kenney are arguing that the 28 turbines they can see from their home on Wolfe Island have devalued their property.

While they can’t always hear the turbines, when the wind is blowing the right way, “it completely fills the atmosphere,” says Gail Kenney. “This is not like the noise of anything I know.” The turbines pollute the night sky, she says, with red lights that flash every three seconds.

The island’s natural heritage has taken a beating as well, Kenney says. The once-abundant deer she used to enjoy seeing have fled. The short-eared owl, a species of special concern in Canada, has all but disappeared from the island’s west end.

Most health concerns are related to the noise the turbines make — particularly “infrasound,” a low-frequency vibration below the normal range of human hearing. Some who live near turbines report disrupted sleep, headaches, nausea, tinnitus and dizziness.

That said, the health impact of turbines has yet to be conclusively demonstrated. In a May 2010 report, Ontario’s chief medical officer of health, Dr. Arlene King, found that scientific evidence to date “does not demonstrate a direct causal link between wind turbine noise and adverse health effects.”

But Dr. Hazel Lynn, medical officer of health for the Grey Bruce Health Unit, reached a different conclusion in a report in January. It’s clear, she found, that many people have been “dramatically impacted by the noise and proximity of wind farms. To dismiss all these people as eccentric, unusual or hyper-sensitive social outliers does a disservice to constructive public discourse.”

Not all people exposed to wind turbines suffer physical symptoms, Lynn said in an interview. But a certain percentage do. “That’s pretty consistent across the world. It’s the same complaints everywhere. And that’s really rare unless there’s some real reason for it.”

More research is required, says Lynn. But that’s hampered by non-disclosure agreements imposed on leaseholders by wind companies, including clauses that forbid them from talking about problems.

“To me, it’s already suspicious before you start,” she says.

Coupled with the Green Energy Act’s removal of local authority over the siting and approval of turbines, this cone of silence has created “a huge sense of social injustice” in rural Ontario, says Laforet. But the Green Energy Act’s cost and ineffectiveness means urbanites are paying a high price, too, he says.

“We see it as a battle all Ontarians are in, because we all lose. We all have to pay more for this power we don’t need. But in rural Ontario, they lose so much more. They lose their way of life, they lose their property values and, in some cases, they lose their health.”

Elmes says she feels “huge despair” at what’s happening. But this month’s announcement that Ontario’s Progressive Conservatives would scrap the lucrative feed-in tariff (FIT) program for wind power projects if elected this fall gives her hope that things could change.

“That’s about the only thing keeping me going. We all just want our healthy, peaceful lives back.”

THE REALITY OF WIND POWER

One of the inherent limitations of wind power is its unreliability. It produces electricity only when the wind blows. And how much it produces depends on how much oomph nature provides at any given time.

Ontario has wind power with an installed capacity of 1,636 megawatts, an amount expected to rise to 2,200 megawatts by early next year.

But in fact, it produces far less than that. Friday morning between 8 and 9 a.m., for example, wind was generating just 31 megawatts of electricity. Between 11 a.m. and noon on Wednesday, when winds were blowing more lustily, it was cranking out 669 megawatts.

In a recent study, Aegent Energy Advisors evaluated wind data for 2009 and 2010 from the Ontario Independent Electricity System Operator (IESO), which measures the output of wind turbines connected to the high voltage distribution grid.

It found that the average “capacity factor” over that time was 27.8 per cent, meaning that for every 1,000 megawatts of installed wind capacity, the average annual output would be 278 megawatts. But that doesn’t account for wind’s variability. That same 1,000 megawatts would produce no electricity at all at if there’s no wind, or as much as 949 megawatts in a stiff gale.

By comparison, nuclear power has an average capacity factor of about 90 per cent. Last year, nuclear reactors produced the equivalent of a continuous, around-the-clock output of 9,452 megawatts.

To replace that nuclear output with wind power, Ontario would require 34,000 megawatts of installed wind capacity, Aegent calculated. The turbines needed for that, it said, would consume 14,200 square kilometres of land -equivalent to a band 14 kilometres wide and 1,000 kilometres long.

Ontario would also need 10,000 megawatts of natural gas generation as a backup for periods when wind power was producing little or nothing, Aegent said.